Saturday, November 22, 2014

JUST 2 MORE WEEKS!

DAY 14

Since they put up the frame of the house, the one question B has wanted to know the answer to is "When are they gonna put on the brick?" Well, buddy, it's finally done!

"We Finally Have Brick!" 

 First Time in House Since Flooring Installed
(think he likes it?)

Today, they put in sinks and some exterior lighting.







They completely finished the brick, but they messed up the decorative circle :( So that's got to be fixed, and they started fixing the problem in the master bath (they made the water closet too small).









Oh, and they put in the shelving in the master bath linen closet!


AND, they installed the garage door windows! So pretty!



And, here's where we currently stand:

  1. Install the master tub and sinks
  2. Tile the guest bath, master bath shower, and kitchen backsplashes
  3. Put in all the plumbing fixtures, door fixtures, electrical outlet covers
  4. Put in inside AND outside lighting and smoke alarms
  5. Put in granite counters
  6. Paint the walls
  7. Paint the house trim and dormers and garage door
  8. Put in floor moldings
  9. Paint the moldings
  10. Put stone around fireplace (and island wall) and connect it to gas line
  11. Put in appliances
  12. Put in our blinds
  13. Put in tile floors and carpet
  14. Brick the house
  15. Install garage door windows
  16. Put in the driveway and walkway
  17. Put in the landscaping
  18. Put in the front sidewalk
  19. Put up our fence
  20. Put up mirrors
  21. Clean
  22. and Inspect.