They started painting the trim. Nothing on inside had been touched.
Day 10
They did part of the backsplash in the kitchen. LOVE LOVE LOVE!!!! They also finished the trim, but not the garage door.
Day 9
Garage door painted. Brick fixed. Nothing done on inside. But it looks SO pretty!
Day 8
Thanksgiving.
Day 7
Nothing done.
Day 6
Plumbing hardware put on everywhere but master shower and tub. We have toilets! (lol) They also put in the mirrors.
Carpet installed. Not really sure why since baseboards have not been painted, and men in work boots will still be tromping through there to work on master bath tiling and plumbing. Not thrilled with that decision.
Master Bath
Guest Bath
Day 5
Nothing touched on inside or outside. We now have 4 days (110 hours!) until we are scheduled to close and this is what their to-do list looks like:
Install the master tub and sinksTile the guest bath, master bath shower, andkitchenbacksplashesPut in all theplumbing fixtures, door fixtures, electrical outlet coversPut in inside ANDoutside lightingand smoke alarmsPut in granite countersPaint the wallsPaint the house trim and dormers and garage doorPut in floor moldingsPaint themoldingsPut stone around fireplace (and island wall)and connect it to gas line- Put in appliances
- Put in our blinds
Put in tile floors and carpetBrick the houseInstall garage door windows- Put in the driveway and walkway
- Put in the landscaping
- Put in the front sidewalk
- Put up our fence
Put up mirrors- Complete electrical box and give power to house
- Clean
- and Inspect.