Tuesday, December 2, 2014

4-3...

Day 4
They tiled the shower. It will have to be redone because they did not put in the custom decorative tile strip. Awesome. They ripped the fresh laid carpet because they dragged something metal across it. Awesome.  Put up half the rebar for the conrete driveway, sidewalks, walkway.

That's it.

Day 3
Little more.

This was the scene when we arrived. Had to park halfway down our block. LOL....but we were just fine with that!





Our Coach Lights
(been dying to see how these looked with our brick/trim choices!)

OMG! ELECTRICITY!!!!

 Added More to the Kitchen Backsplash

We were so stinkin' excited to see all the workers there painting and cleaning!!!! 
 



More Lights!
 


Supposed to have a walkthrough tomorrow...hmmmm.

  1. Install the master tub and sinks
  2. Tile the guest bath, master bath shower, and kitchen backsplashes
  3. Put in all the plumbing fixtures, door fixtures, electrical outlet covers
  4. Put in inside AND outside lighting and smoke alarms
  5. Put in granite counters
  6. Paint the walls
  7. Paint the house trim and dormers and garage door
  8. Put in floor moldings
  9. Paint the moldings
  10. Put stone around fireplace (and island wall) and connect it to gas line (finish fireplace)
  11. Put in appliances
  12. Put in our blinds
  13. Put in tile floors and carpet
  14. Brick the house
  15. Install garage door windows
  16. Put in the driveway and walkway
  17. Put in the landscaping
  18. Put in the front sidewalk
  19. Put up our fence
  20. Put up mirrors
  21. Complete electrical box and give power to house
  22. Clean
  23. and Inspect.