Wednesday, December 3, 2014

2 Days???

Day 2
We were supposed to have a walk-through tonight.

Yeahhhhhhh...no.

When I pulled up at 4:15, this is all that had been done:


While we went inside to see what else had not been touched, the builder found us. Let's just say I was not very polite person. But, we talked and he swore that closing was still on for Friday morning.......not really sure how that's possible, but I had to leave and he and Jay talked for another half hour and went through every single area of the house. Jay seemed positive. I am still scared. Our movers said they had no available dates for over 2 weeks if we have to cancel. We have to be out of the house 100% by Tuesday night. And if they move it back even a few hours Friday, chances are the loan won't be funded by the end of the workday and we would not have the right to move in. And Jay can't take off Monday. And I can't take off Monday AND Tuesday.

This could get ugly...

  1. Install the master tub and sinks
  2. Tile the guest bathmaster bath shower, and kitchen backsplashes
  3. Put in all the plumbing fixtures, door fixtures, electrical outlet covers
  4. Put in inside AND outside lighting and smoke alarms
  5. Put in granite counters
  6. Paint the walls
  7. Paint the house trim and dormers and garage door
  8. Put in floor moldings
  9. Paint the moldings
  10. Put stone around fireplace (and island wall) and connect it to gas line (finish fireplace)
  11. Put in appliances
  12. Put in our blinds
  13. Put in tile floors and carpet
  14. Brick the house
  15. Install garage door windows
  16. Put in the driveway and walkway
  17. Put in the landscaping
  18. Put in the front sidewalk
  19. Put up our fence
  20. Put up mirrors
  21. Complete electrical box and give power to house
  22. Clean
  23. and Inspect.